The event was held on 18th October 2009 in which PT Kereta Api, IRPS, Kompak, GM-MarKA, and KRL-Mania participated. Acting as a coordinator was Slamet Haryadi of Jakarta branch of IRPS. First the team assembled a motorised draisine to carry railway company’s grass cutting tools. Then the draisine moved eastward from Cibinong Station to Nambo Station. At the location, a part of the team started to cut tall grass growing wild along the rail line, meanwhile the draisine returned to Cibinong to pick up waiting railfans.

After the line was cleared of wild-growing tall grass, the draisine returned to Cibinong Station, carrying the tools and staff of the railway company. After arriving at Cibinong Station, the draisine moved eastward again. Railfans and Cibinong Station Master, using the draisine, inspected the cleared line to Nambo Station, where they were greeted by Nambo Station Master.
masa sih ini yg di citayam?
kok gak ada tiang listrik untuk KRL nya?
setau saya, di daerah sana [depok-bogor] itukan lintasan KRL dan tentunya pasti ada tiang listrik untuk KRL nya… 🙂